SKYBOLT BUILD

 

 

The parts arrived from the USA on the 9th of December 2010. The boxes were unpacked and inspected. One of the crates with the wood for the wings were cracked. Lucky no damage were visiable to any of the wood. In the box were all the lasercut wood for the wings, fuel tanks(top wing tank and firewall tank), steel brackets, bolts ect.

 

So work began on the 13th of December 2010. The first piece was the wing longrons. So far side have been manufactured.

 

Updates will follows as we progress.